Smartest Options for the HVAC Repair Now

0
100

After selecting the location of the indoor unit, hvac services greenville sc have to fasten it to the wall with almost 8-12 dowels in order to be able to carry out the repair work later, that is, access to the Air conditioning. It is important that the console has adequate space for movement. Since the outflow water has to be discharged, water leveling is very important, if it is not there, then the water cannot escape to the outlet. Dripping water is released by gravity, so the tube must be laid out from the indoor unit. With the Athens, GA HVAC service the options come perfect.

The Right Instruction

In the installation instructions, describe for each device the size of the pipes and the insulation required for the machine and even the electrical wiring. The drilling should be done with a reliable machine at the wall break, and before that you have to look again at the bridges or concrete beams during the drilling process. The hole should be so large that all the wires pass through it. It is advisable to place the insulation on the pipes before installation so that they will not be damaged. Then the two Dutch screws are loosened on the indoor unit and removed. The copper pipes used for the connection are always cleaned and the Dutch screws are placed. With the help of a flange, we can press the flange to the end of the pipe. Then, tighten the inner stub and the Dutch screw with proper force, be careful not to break the thread. Then the electrical work can be done.

The Right Appliances

Appliances are usually supplied with refrigerant at 5 meters, if a longer pipe is required, the refrigerant must be filled. You should not pay attention to the difference in level, since the maximum difference between the indoor and outdoor units is 3 meters, otherwise an oil bag should be created. This is very important for compressor performance. The brackets can be purchased or made, but here again the finished solution is better. In the shops you can buy vibration absorbing rubber caps and fixing screws. To eliminate pipe breaks, it is advisable to bend the tubes in as large a curve as possible when installing the console.

The Outdoor Units

Air conditioning outdoor unit assembly

In the outdoor unit, the Dutch assembly and pipe installation should be repeated in the same way. For Dutch bindings, do not forget pre-crimping, which is needed to avoid future defects. The solenoid valve is provided with a closing cap beside the mandrel, during which the pin 2 can be opened with an Allen key. With the pressure gauge, we can connect to another threaded bundle opposite the Dutch. By connecting the pressure gauge to the service coupling, the vacuum pump can start the vacuum. If this is done, the vacuum test can come. Turn off the pump and wait about 60 minutes. After that, it turns out that vacuuming was successful.